英語版: Index
scheduling Interfaces
1. 責務の境界 (Responsibility Boundary)
スケジュール実行ジョブの契約。
ドキュメント一覧
変更履歴
- v0.0.0 / v0.0.0.0: 初期ドラフト
- v0.0.1 (2026-05-06): カテゴリ新設と src 整合の反映
This concise reference page is part of the architecture documentation area for AIKernel.NET. It is generated from architecture/interfaces/scheduling/index-jp.md and should be read together with the surrounding category pages in the side navigation.
Source:
architecture/interfaces/scheduling/index-jp.md